Plan your SCANIT scan visit
Pick a scan window when you order, give our crew site access in the pre-scan checklist, then confirm the date we propose.
A SCANIT scan needs our crew on site, so the visit is planned between you and our Scanning team. You choose a window when you order, tell us how to get in with the pre-scan checklist, and confirm the date we propose. This guide walks those steps and how to change a date.
- You are placing, or have placed, a SCANIT order. Ordering itself is in Request a SCANIT scan.
- Have the on-site contact's name, phone and email to hand, and the times the building is open to us.
Choose a scan window when you order
In the order, under Book your scan window, pick when you would like the scan: As soon as possible, Within a week, Within 2 weeks, Within 4 weeks, In 1 to 3 months or Not sure yet. Within 2 weeks is selected to start with.
The window is your preference, not a booking. As soon as possible means the earliest date our crew has free. After you order, our Scanning team proposes a date. If you pick Not sure yet, our Scanning team emails you to agree one.
Choose the scan hours
Under Preferred scan hours, pick Standard hours (Monday to Friday, 8am to 5pm) or After hours (evenings and weekends). After hours adds an After Hours item to your order, so check the estimate.
Add access notes and a certificate of insurance
Use Special instructions for access needs, scheduling limits or anything about the space the crew should know. If the site needs one, turn on Certificate of insurance. We send it before the scan visit.
Fill in the pre-scan checklist
After you order, the project shows the step Fill in the pre-scan checklist. Click Fill in checklist, or open the project's Pre-scan checklist tab. Fill in:
- On-site contact: a name, phone and email, and a backup if you have one.
- Site access: how the crew gets in, parking, the loading dock, and the times access starts and ends.
- Scan logistics: the space's condition and occupancy, areas the crew can't enter, and any hazards.
- Certificate of insurance, if the site needs one: the certificate holder, their address and when it is due.
Click Send site details. The tab then shows Submitted.
We need the checklist, and the certificate of insurance if the site needs one, before we can confirm your scan date.
You can change the checklist any time before the scan date: click Edit details, then Save changes.
Confirm the date we propose
Our Scanning team emails you the date it proposes. Reply to the email to confirm it or suggest another date.
The project also reads Confirm your scan date and shows the proposed date. You can click Confirm in chat there instead.
Check the visit is booked
Once the date is set, the project shows Scan scheduled and Your scan is on the books, with the scan date. Our technician sees you on that day. Any steps still open on the project send you a reminder, due on the scan date.
Change the scan date
Tell us in chat with the project name and the dates that work for you. Only our team can set the scan date, so there is no date field to edit yourself.
Ask at least 48 hours before the scan. A later change may carry a charge, and our team confirms it with you first.
Troubleshooting
If our team edited the checklist while you had it open, your save is refused so neither change is lost. Reopen the tab, check what changed, and save again.
We rebook the visit with you. A return trip may be charged, and our team confirms any charge with you first.