What BIMIT costs
BIMIT is priced per square foot, at a rate set by the setting you order. BIMIT 100 is $0.04 per sq ft, BIMIT 200 $0.08, BIMIT 300 from $0.27.
BIMIT is priced per square foot of the building you send us. There is no licence, no seat fee and no subscription. You pay for the model you order, at a rate set by which BIMIT setting you choose.
If someone asks "price?" on a BIMIT page, these are the rates they mean. SCANIT (a scan by our crew) is priced differently, per project, in the order form; see How pricing works.
The rates
| Setting | Rate |
|---|---|
| BIMIT 100 | $0.04 per square foot |
| BIMIT 200 | $0.08 per square foot |
| BIMIT 300 | from $0.27 per square foot |
BIMIT 100 and BIMIT 200 are fixed rates: multiply the rate by the square footage and that is the price of the model. A building too large for them is modeled at BIMIT 300; see Choosing a setting.
BIMIT 200 is coming soon. Its rate is listed so you can compare the settings, but it can't be ordered yet; see Choosing a setting.
BIMIT 300 is quoted per project and starts at $0.27 per square foot. The final rate depends on the scope you choose, and you see it on your estimate before you commit to anything.
How you pay
BIMIT 100 and BIMIT 200: half the price is charged when you order (at upload), on the floor area declared with the order. The rest is charged to the same payment method when your files are ready, and it follows the floor area the BIMIT engine measures as it builds your model.
BIMIT 300: the price on your estimate is the price.
Minimums and larger projects
BIMIT 100 and BIMIT 200 have no minimum order size: the price is the rate times the area. The smallest amount ever charged is $1.00.
For a portfolio, or a building over 1,000,000 sq ft, we plan the price with you: book a call.
A worked example
A single building of 30,000 sq ft, fully scanned:
| Setting | Rate | Model price |
|---|---|---|
| BIMIT 100 | $0.04 | $1,200 |
| BIMIT 200 | $0.08 | $2,400 |
| BIMIT 300 | from $0.27 | from $8,100 |
The table is arithmetic on the rate card. At BIMIT 100 and BIMIT 200 the final charge follows the area the engine measures; at BIMIT 300 your estimate is the price.
What sits alongside the rate
| If you are asking about | Read |
|---|---|
| Getting a price for a specific building | Estimates |
| What you get for the money | What is BIMIT? |
| Getting a scan to us in the first place | Request BIMIT |
| Talking a large project through | Book a call |