When you pay
A BIMIT order is paid in two halves — a deposit up front and the balance at delivery.
A BIMIT order is paid in two halves. Nothing is taken before you place the order, and the second half is not taken until there is something to hand over.
The split
| When | What is taken |
|---|---|
| At the point you order | 50% of the order total, as a deposit |
| When your deliverables are ready | The remaining 50% |
The deposit is what commits the order and puts it into production. The balance is charged against the finished model, so you are never paying the full amount for work that has not been done yet.
Both halves are halves of the same figure — the order total you accepted. The split does not change what the work costs, only when it is collected. Where that total comes from is in What BIMIT costs.
What you are paying, and who you are paying
Integrated Projects — IPX — is the merchant of record for your order. IPX takes the payment, issues the invoice, and is the name on the receipt and on the card or bank statement. If you are reconciling a line item and it does not read IPX or Integrated Projects, it is not one of our orders.
That holds no matter where you started the order from. The platform you placed it through does not become the party you are paying.
If the order does not complete
The two-stage split exists partly so that a stalled or cancelled order is not a fight about a full payment already taken. What happens to a deposit when an order is cancelled, and when it is refunded, is covered in Cancelling an order. If we could not use your scan and rejected the project, see Rejected projects.
Related
| If you are asking about | Read |
|---|---|
| The price itself | What BIMIT costs |
| Getting a figure before you commit | Estimates |
| Finding an invoice or a receipt | Invoices |
| The order flow itself | Placing an order |
| Getting the files once paid | Downloads |
Where each of the two charges shows up afterwards.