Levels are numbered from the ground
A building with a floor below ground came back with every storey numbered one too high. Levels now count from the ground floor, which sits at elevation 0.

The BIMIT engine numbered levels from the lowest one it found, and measured heights from the middle of the scan. In a building with a basement, the basement took the ground floor's number and no level sat at 0.
The engine now finds the ground floor and puts it at elevation 0. In Revit, an imperial model names it Level 1 and the floor below it Level 0. A metric model names them Level 0 and Level -1. This applies to models made on or after November 12, 2026.